Weeks 4-6
October 2008
The bridge abutments are formed on top of the concrete slabs. Wood panels and rebar will hold the concrete abutments in place.
A concrete mixer with a crane attachment delivers liquid concrete into the forms.
After several days of curing, the wooden forms are removed from the bridge abutments, revealing
the concrete and steel structure within.
|