Weeks 4-6
October 2008

Framing     Framing-
   
 Forming     Framing5
  
Framing6

  

The bridge abutments are formed on top of the concrete slabs.  Wood panels and rebar will hold the concrete abutments in place.

  


  

Crane     Crane-

  

A concrete mixer with a crane attachment delivers liquid concrete into the forms. 

 


   
Form Strip    
After several days of curing, the wooden forms are removed from the bridge abutments, revealing
the concrete and steel structure within.
   