Weeks 7-10
November 2008
Stripping     
   
       The last pieces of the framing are removed from the bridge abutments.   

  

      Filling 3 

  

Filling 1     Filling 2    

   

Excavator operator Tim Ambrosi fills soil back around the bridge abutments.   

 


   
Channel     Channel 2
  
Channel 3     Channel 3
Rock "armor" is placed along the creek banks to prevent further erosion.
The creek channel is regraded to a shallow slope for steelhead trout habitat.
   